Wednesday, May 13, 2009

Pane-fully clear...


Whoops! Sorry about the missed post last week! I was on vacation all last week in the beautiful Big Sur/Monterey Bay area of California, and Lisa was supposed to do the blog entry, but we started a huge project with our collection, and she never got a chance! Mea Culpa.
We did make it over there today, and I can't believe how much got done in the space of just one week! The main thing to see right now are all the windows! The exterior windows are in and some of the framework is installed. The windows in the doors are in, and the windows in the offices are there. The floor to ceiling windows in the board room are installed, and it's just a tiny bit freaky to stand there and look straight down at the first floor!

The other big news is that the entryway floor is being sanded down to the final color. It's hard to see from the pictures, but the colors are a mixture of browns and golds and bronzes. Quite striking when the light hits it!


The circulation desk is installed, and makes a statement when you walk in. There's no missing where you can check your material out! Some of the interior "feature walls" have been painted as well -- they are very pretty with a kind of dusty blue and marigold color.

The flooring for the back area is not installed yet, but the rolls are there. It is some sort of composite recycled tennis shoe flooring, and should be very interesting. We have also heard a rumor that the carpeting upstairs will begin maybe this week, but that's just a rumor right now.


Outside, all the bare twigs and branches have leafed and flowered out, and the grounds are looking very picturesque. Soon we hope to be installed back where we belong, out of this temporary spot and into your beautifully restored and remodelled new building.

Theresa

No comments:

Construction Zone Counts

Location:

Richland, Washington, United States